Is it necessary to change the cold water meter? Hot and cold water meters - how often do they need to be changed by law? In what order are water measuring devices checked?

In 2008, the Government of the Russian Federation adopted Federal Law No. 102 on the unity of measuring instruments. It aligns measurements of consumed resources with metrology requirements.

This protects the rights of citizens by preventing overpayment for unused resources.

In accordance with legislative acts, metering devices are periodically checked for accuracy of measurement indicators. They are sealed by specialists from certain authorities.

Legislative acts on measuring instruments and methods

To calculate the volumes of cold and hot water used, meters approved for use by the State Register are used.

All water consumers in private, apartment buildings, temporary industrial facilities should
install water consumption meters and change them on time.

Water suppliers and consumers enter into an agreement on the performance and payment of the service, which must be completed no later than 6 months from the date of signing. The law prescribes mandatory installation counters. This allows you to save more water, electricity, heat, and determine the amount of losses.

At home, having consumption meters for the listed resources, the consumer is interested in their economical use. The dimensions are legally approved even in its absence. Decree of the Government of the Russian Federation No. 354 of 05/06/2011 determines the procedure for calculating for the use of water by residents of private and apartment buildings. The same law stipulates the rules for the provision of services by public utilities.

To obtain reliable information about consumed water, you must have precision instrument accounting. Therefore, meters are periodically tested for measurement accuracy. The amount of payment depends on their testimony.

Deviations in readings are not needed by either consumers or suppliers.

On pipes with cold and hot water install different meters. Hot water contains chemicals. Her heat also affects the parts of the device. Therefore, hot and cold water meters are made of different materials, allowing you to use the device long time. The hot water meter is checked more often than the cold water meter. The test will reveal device malfunctions. This will be a reason to change it.

Counter cold water On average, it is checked once every 6 years, hot water - once every 4 years. If the device is in working order, it must be resealed after installation. There is no need to change a working meter. Only those devices that provide inaccurate data should be replaced. Maximum term meter service – 12-18 years.

Resource providers keep records of each device and notify consumers in advance of the need to conduct a scheduled meter check.

You can check the quality of the device’s operation on site without removing it from the system. Owners can independently choose an inspection organization that has a license to carry out such work.

To check the device in place, you need to:

  • negotiate with the housing office on a temporary shutdown of water,
  • open the pipeline for inspection,
  • ensure the working condition of the system pipes,
  • check the reliability of the water shut-off taps and valves.

Then the device must be removed or checked in the system. The verification company’s specialists do not dismantle the device themselves. To do this, you need to call a plumber who is assigned to the house. He removes the meter and hands it over for inspection.

In the presence of the owner, a report on the seizure of the device is drawn up, the brand and series number are recorded. When checking, you need to have a passport of the device and a passport of the owner. If the device is examined in inpatient conditions, it should be returned to the owner in a few hours, or in 2-3 days. Based on the results of the verification, the following documents are drawn up:


If during verification it turns out that the device is not suitable for further use, it must be replaced with a new one. If the meter is working properly, it is set to work until the next verification.

It is easier to check the device in place without removing it from the system. In this case, you do not have to turn off the water and dismantle the water meter. True, to carry out measurements you will have to release about 250 liters of cold water from the tap. The consumer will have to pay the cost. But, on the other hand, he will receive a conclusion about the verification carried out immediately on the spot and he will not have to remove and install the device. If the consumer is confident that there is no instrument error, this method is acceptable. If an inaccuracy in the readings is discovered, the device will need to be dismantled and replaced with a working one.

It is important not to miss the deadline for the next verification of water consumption meters. The readings of an unverified meter are considered unreliable, and charges for the overdue verification period will be averaged, as if there was no meter. The amount of monthly water payment will be several times higher than according to the meter.

Verification of any individual metering devices is a paid service. Each region has its own payment tariff.

Is it necessary to install a meter in practice?

This point is not very clearly stated in the Federal Law. In principle, it is not profitable to use water in an apartment without accounting it. The tariff sets payments for hot and cold water at almost 60% more than the average consumption rate.

Some regions make their own amendments and nuances to the law. For example, in Moscow, by Decree of the Capital Government No. 77-PP dated February 10, 2004, certain intervals between checks of metering devices were abolished. Housing and communal services do not have the right to force consumers to change meters, much less advertise inspection organizations.

The law requires the installation of water meters, but does not mention sanctions for those residents and consumers of the resource who do not do this. The law does not provide for any administrative penalties. The consumer must install and change metering devices at his own expense.

Everyone who uses hot/cold water meters has long been convinced that this approach allows for good savings. The population is guided by the principle that you need to pay for what you use - this is the most correct approach.

Legislation

The government has adopted several acts that regulate the means and methods of measuring water supply. Federal Law No. 102 of June 26, 2008 - this law governs the provision of uniform measuring instruments. The document defines the need to check devices according to metrology requirements.

The purpose of the act is to protect the rights of citizens, society and the state from negative influence incorrect measurements. This document also establishes a period after which the inspection must be carried out. During this period, the device operates unhindered, taking into account the supply of cold/hot water. It is allowed to install only those meters that are approved by the register of measuring instruments of the State Standard of the Russian Federation.

Federal Law No. 261 dated November 23, 2009. This law “On energy saving and increasing energy efficiency and on introducing amendments to certain legislative acts of the Russian Federation” obliges all water utility subscribers in apartment buildings to install water meters without fail. To do this, you need to draw up an agreement with the water utility, and 180 days are given for all installation procedures.

Mandatory installation of a meter provides the following advantages:

  1. Economical management of resources.
  2. The measuring tool allows you to determine possible losses.

Decree of the Government of the Russian Federation No. 354 dated May 6, 2011. This document explains the features of payment for the use of water and other services in apartment buildings, as well as the rules for providing utilities. The resolution clearly defines the concept of the amounts payable in the presence of a meter, as well as in its absence.

Why is it mandatory to check meters?

The device for measuring the amount of water supplied is accurate measuring instrument. The latter may simply work together over time and show a false expense for which you may overpay.

Neither the water utility nor the end client in your person will like this situation. What is the reason for the loss of measurement accuracy and how large is the error, and in what direction?

Hot/cold water has different effects on metering devices. Hot water contains chemical additives that, in tandem with high temperature, aggressively affect the parts and mechanisms of the measuring instrument. Therefore, checks of such devices need to be done more often.

The result of such a test can show complete serviceability, while failed equipment should be repaired or replaced.

When is it necessary to change water meters?

Inter-inspection period established measuring instrument in a hot water supply system is 4 years. As for cold water supply, meters are checked every 6 years. Deadlines They don't say it will need replacement. The water meter must be replaced when a breakdown is detected and recording occurs with errors.

The average service life of the meter is 12 years. From this we can easily conclude that one copy can last 6 years, and the other – all 18. It is important to note that you need to start the meter checking procedure in advance, and not on the last day of the end of the checking interval. It is best to do this one to one and a half months in advance.

If a review is due, the supplier may also notify you by written notice.

How are water meters checked?

The check is performed on specialized equipment, but not everyone knows that the same check can actually be done right on site. To carry out the procedure, the subscriber can choose an organization that has the right to perform this type of work.

The procedure for replacing the meter:

  • Before starting work, be sure to turn off the water by prior agreement in the housing office;
  • open access to water supply pipes;
  • the condition of the pipes must be satisfactory;
  • Shut-off units should be provided in the apartment to locally shut off the water.

The check is performed using several methods:

  1. With the counter removed.
  2. Without removing the meter.

If you use the services of a specialized company, call a home plumber to dismantle the water meter. The removed meter will be put into operation and a document on seizure will be drawn up, which indicates the serial number and brand of the device. Keep the documents for the meter with you - your passport and your passport as a citizen of the Russian Federation.

The verification procedure is performed using a calibration unit, which verifies the readings as accurately as possible. The duration of the check ranges from several hours to several days. When you receive the water meter back, you will be given the following documents:

  1. Meter installation agreement.
  2. Certificate of completed work.
  3. Document confirming the commissioning of the water meter.
  4. Certificate for cold water supply meter.
  5. Passport for hot water supply water meter.
  6. Certificates for equipment.
  7. Maintenance contract.

If after checking it turns out that the water meter is broken, it will need to be replaced. A working device is installed in the same place, all changes are documented. The new water meter can be used until the next check comes.

Checking the water meter on site in 2018-2019

When choosing a company to check the meter, make sure that it is specialized and has the appropriate permits for such activities. Upon arrival of specialists, everything is done necessary tests water meter This approach is the most convenient - you save a lot of time. Representatives of the equipment testing company independently contact the water utility, which, in turn, eliminates the need for verification. You, as a client, receive a document about the date and results of the meter tests.

This on-site testing approach has its drawbacks. During the test, up to 250 liters of water are passed through the device, for which you will need to pay. If a malfunction is detected, you will not be able to repair or adjust the water meter on site - dismantling will still be required.

If the check was not completed on time: what to do

If there is a water meter inspection report, its owner is obliged to ensure that he does not miss the deadline for the next procedure.

An incorrectly functioning meter is considered unusable, and payment based on these readings is impossible. Thus, in such a situation, you will pay for water utility services according to average standards. In simple words, as if you do not have a meter installed taking into account the number of people living in the apartment.

These numbers will be much higher than what you paid if you had a properly working meter.

Is the verification service paid or not?

You have to pay for these types of checks. The cost varies from 370 to 1,000 rubles. You can make payments online without commission. Organizing the verification procedure is not at all difficult. How you perform the check is at your discretion.

To summarize, we note that meters need to be checked once every 6 years for cold water supply, and once every 4 years for hot water. The procedure is paid, and the maximum cost for the service does not exceed one thousand rubles. There are only three ways to check:

  1. Inspection by the water utility with dismantling of the water meter.
  2. Self-diagnosis on site with the involvement of a specialized organization that has all the permits to carry out such work.
  3. Dismantling and checking the same specialized company on site, only in a shorter period of time than diagnostics at the water utility.

The last two methods allow you to quickly complete the procedure, and the company’s specialists contact suppliers and notify them of the completed check.

Do not ignore the end of the interval and the need to test the water meter. By doing this, you can only overpay for the water supply services received at prices that are considered average.

Anyone who installed meters on pipelines supplying cold and hot water from the central networks, I was able to verify that it was profitable. There is a category of the population that believes that, and this is the most correct approach.

Dear readers! Our articles talk about standard methods solutions to legal issues, but each case is unique.

If you want to know how to solve exactly your problem - contact the online consultant form on the right or call the numbers below. It's fast and free!

Laws regarding the installation of water meters

The government has adopted a number of legislative acts relating to measuring instruments and methods.

Federal Law No. 102 dated June 26, 2008

Federal Law “On Ensuring the Uniformity of Measuring Instruments”, it defines the need for verification of measuring instruments to metrology requirements.

The purpose of the Federal Law is to protect the rights and legitimate interests of citizens, society and the state from negative consequences unreliable measurement results.

Verification (verification) is a set of activities carried out to confirm the compliance of metering devices with metrological requirements.

Checking a device is checking its serviceability and accuracy using special equipment.

The law regulates the period during which the meter can operate unhindered and what intervals are permissible between verifications of hot and cold water flow meters.

Metering devices are allowed to be installed only those included in the State Register of Measuring Instruments State standard RF.

Federal Law No. 261 dated November 23, 2009

This law states the need to draw up contracts between the service provider and their consumer; this act allocates 180 days for compliance with the requirements.

The Energy Saving Law makes it mandatory to measure the consumption of utility resources.

Mandatory installation of metering devices will make it possible to:

  1. Increase the ability to save resources;
  2. Allows you to determine losses.

Decree of the Government of the Russian Federation No. 354 of 05/06/2011.

This act explains the nuances of fees for the use of water and other services for residents of apartment buildings and residential buildings, as well as the rules for the provision of utility services.

The concept of the amount of payment in the presence of a metering device and in the absence of one is clearly divided here.

Why are water meters subject to mandatory verification?

A water meter is a fairly accurate and sensitive device, which after a period of time can fail, that is, show an inaccurate water consumption.

Such indicators are of no interest to either the consumer or the supplier. Why are the readings on the meter no longer accurate, and how much do the device data differ from the actual ones, and in what direction?

Hot and cold water have different effects on metering devices. It is clear that hot water contains chemical additives, so its composition and high temperature are more aggressive towards the meter parts, and therefore verification of metering devices on hot water supply pipelines needs to be done more often.

A check may show that the device is working properly, and damaged metering equipment must be repaired or replaced.

When do you need to change water meters?

The calibration interval for a meter installed in a hot water supply system is 4 years, for one installed on a cold water pipe - 6 years.

Cold water meters should be checked no later than after 6 years, and hot water meters after 4 years.

There is no need to think that the period set for verification means the replacement of flow metering equipment. The water meter needs to be changed only if it does not work or shows incorrect water consumption figures.

The service life of a water meter is on average 12 years, which means that one device can last 6 years before failure, and another - 18 years.

It should be remembered that it is better to take care of the issue of verifying the water flow meter in advance, 1-1.5 months before the end of the verification interval.

The service provider company maintains records for each apartment, each house or other facility. If the user himself has forgotten that the period between verifications is coming to an end, he will be reminded - he will be sent a notification.

Procedure for checking water meters

How are water meters checked? Since verification must be carried out only with the help of special equipment, not everyone knows that verification can be carried out not only in stationary conditions, but also on site.

To carry out work, citizens independently choose an organization that has the necessary permits.

How to replace a water meter?

  1. Before work starts it is necessary to take care of turning off the water, having agreed upon this with the Housing Office;
  2. Provide access to water supply pipes;
  3. Pipes must be in satisfactory condition;
  4. Cranes (valves, Ball Valves) must completely shut off the water in the apartment.

The check can be done in several ways:

  • With removal of metering devices
  • Without removing metering devices

If the verification is carried out by a specialized company, then you should call the plumber servicing the house to remove the meter. The dismantled device will be put into operation, a withdrawal report will be drawn up, indicating the brand and serial numbers. You need to have a document for a water meter with you - a passport and your passport as a citizen of the Russian Federation.

For the verification procedure, special calibration installations are used, which allow the accuracy of the readings to be verified as accurately as possible.

Having received his accounting equipment back after some time, from several hours to several days, the consumer will receive the following documents:

  1. Agreement on installation of water meters;
  2. Certificate of completion;
  3. Certificate of commissioning of a water meter;
  4. Certificate for cold water meter
  5. Passport for hot water meter
  6. Certificate for meters
  7. Maintenance contract.

A water meter found to be unsuitable will have to be replaced; a working one must be installed on former place and use it until the next check comes.

There are methods in which the removal of meters is not required - verification will be carried out right on the spot.

It is necessary to make sure that the company is accredited and its employees are certified.

How are water meters verified? We invite you to watch the video.

Of course, this verification method is extremely convenient. Representatives of the company will contact the supplier themselves and remove the issue of verification. The service consumer will receive a document stating the date and results of the procedure performed.

This method also has disadvantages. In order to carry out an accurate verification, about 250 liters must pass through the device connected to the tap. water, for which the apartment owner will have to pay.

If an error is detected on the water meter, you will not have the opportunity to repair or adjust the device on the spot. The device will still have to be removed.

What threatens the owner of a residential property if he does not check on time?

Having the IPU verification certificate in hand, the owner must ensure that he does not miss the deadline for the next inspection.

An unverified water meter, both hot and cold, is considered unusable, which means it is impossible to pay according to the readings of such a device.

Further bills for water use will be issued at average rates, as for users who do not have meters, taking into account the number of residents registered in the apartment.

These standards will force the consumer to spend a significantly larger amount each month than when the meter readings were taken into account.

IPU verification is a paid service or not?

Citizens are required to verify the IPU ( individual devices metering) at your own expense within the time limits specified by the manufacturer and specified in the metering device passport.

You have to pay for verification. IN different regions the cost differs, but the average figures range from 370 rubles. up to 1000 rub.

At the same time, it would be useful to note that the cost of work when using a portable standard, that is, on site, without dismantling the water meter, and in the case of removal are almost equal.

Tracking the verification period and organizing its implementation is not so difficult. A self-respecting home owner will always be interested in ensuring that the equipment in his living space works correctly and is in good working order. You can choose any of the methods for checking water meters.

Electricity metering devices may be replaced for various reasons.

The electric meter may fail, maybe it may technically outdated, or a subscriber of an energy supply company may want to install a more modern multi-tariff device, which can significantly save money spent on electricity.

Dear readers! Our articles talk about typical ways to resolve legal issues, but each case is unique.

If you want to know how to solve exactly your problem - contact the online consultant form on the right or call free consultation:

However, replacing meters electrical energy very difficult, since there are many rules and laws that the owner or other subscriber of the energy supply company will have to comply with. Not many people know at whose expense electric meters are replaced in Moscow and other Russian cities.

What is it regulated by?

Maintenance and replacement of electricity meters regulated by Russian legislation:

  • Art. 543 and art. 210 of the Civil Code of the Russian Federation;
  • Housing Code;
  • Federal Law No. 261 of November 32, 2009;
  • Federal Law No. 102 of June 26, 2008;
  • decision of the State Standard of the Russian Federation;
  • Resolutions of the Government of the Russian Federation No. 530 and No. 491.

Who changes and at whose expense?

Do I need to change my electricity meter at my own expense? Depending on the location of the meter inside the apartment (private house) or in the entrance, responsibility for the condition and correct work electricity meters are borne either by the owner of the residential premises or Management Company.

In a privatized apartment

At the entrance

According to Decree of the Government of the Russian Federation No. 491, electricity meters located on landings in the entrances of apartment buildings are.

Accordingly, all work and expenses for replacing electric meters must be carried out management company in whose department the residential building is located.

However, the law stipulates the possibility of payment for work by the owner of the apartments, if such a provision is stipulated in the agreement between the owner of the residential premises and the management company.

If this is not specified in the contract, then all costs must be borne by the management company.

In a private house

The owner of a private house fully pays the cost of replacing a failed electric meter in accordance with Russian Government Decree No. 530, since he is the owner of the residential premises.

In those rare cases where a user of an energy supply company resides in the municipal private sector, replacement of electricity meters is carried out in the same manner as in municipal non-privatized apartments.

Rules and terms

When replacing an electric meter, there are strict rules that must be followed.

If the replacement procedure is violated and the seal is broken You may receive a significant fine, the paid energy can also be re-accounted for at the maximum tariff for the last 3 years.

If you contact the energy supply company accordingly, obliged within 10 days Send an electrician and replace the electric meter.

Electricity meters whose service life, according to their passport data, has expired must be replaced. Outdated metering devices are also being replaced.

If it's broken

If the electric energy meter is out of order, then under no circumstances should you try to repair it yourself, since the seals of the device manufacturer and the regulatory organization will be broken, which entails penalties.

If a malfunction is detected, the owner or other subscriber must contact energy supply company and do the following:

  1. Write an application for a specialist to visit you, indicating your home address and signs of damage.
  2. Find out the arrival time of the specialist from the dispatcher by phone.
  3. Wait for a specialist who will check the sealing and technical condition of the device.
  4. If necessary, the electric meter should be replaced.

Can I replace it myself?

Is it possible to replace the electric meter yourself? Theoretically it is possible replace the electric meter yourself or with the help of a familiar specialist.

With such a replacement, you must obtain official permission from the energy supply company, and removing the seal on the old meter must be done in the presence of a specialist from the management company.

At self-replacement Technical safety rules must be strictly observed.

Procedure

How to change the electricity meter? When replacing an electric meter the following procedure should be followed:

  • you should contact the energy supply organization and obtain permission to replace the electricity meter;
  • you need to obtain a certificate, without which you will not be able to purchase a meter in a store;
  • you need to obtain permission to remove the seal from the management company (it is possible that the management company will send an observer);
  • you need to choose a suitable meter, approved by the energy sales company and technologically suitable for replacing the old one;
  • the electrician is sent by the energy supply company or is located independently (the electrician must have group 3 electrical safety);
  • it is necessary to dismantle and save the old electric meter for a specialist to check its data;
  • Next, you should install a new meter and make sure it is working correctly;
  • it is necessary to call an inspector for inspection and sealing.

Is notification sent?

If the initiator of replacing the electric meter is the energy supply company, then the owner of the residential premises notification is sent, which informs about the need to replace the meter and instructs you to purchase a meter and pay for its installation services.

This usually happens when the previous meter expires. In cases where the initiator of the replacement is the owner of the apartment, he must contact the energy supply company with a corresponding application.

Checking and sealing

After installing a new electricity meter, the owner or subscriber of the energy supply company should as much as possible short time call a specialist, who will check the operation of the device and seal it.

Without these procedures, the new electric meter will not be put into operation.

To call a specialist, you should contact the management or energy supply company and pay for this service according to the receipt provided.

What documents are issued?

After installing a new meter and sealing it to the owner a sealing certificate is issued, which should be submitted to the management company to recalculate the cost of providing electricity.

Thus, if the electric meter is located on landing, or is carried out in municipal housing, then replacing the meter is the prerogative of the management or energy company.

If the meter is installed in the owner’s apartment, then replacing the device will cost him a significant amount, and when working on dismantling and installing a new device, the strict rules established by regulations and laws must be observed.

You can learn about the rules for replacing electric meters from the video:

It is not the verification that has been canceled, but its fixed deadlines! An article about this from the newspaper "Star Boulevard"

Four questions about water meters

The editors receive many questions regarding the mandatory verification of water meters. All of them are associated with the release in December last year of Moscow Government Resolution No. 831-PP, which canceled the document that regulated the procedure for installation, maintenance, and verification of water metering devices (Appendix 1 to Moscow Government Resolution No. 77-PP dated February 10, 2004). So is it necessary or not to carry out verification?

The changes were commented on by the Directorate of Housing and Communal Services and Improvement of the North-East Administrative District.

1. Do I need to check or install new cold water meters?

Need to. It is not the verification at all that has been canceled, but its fixed terms - 4 and 6 years for hot and cold water meters, respectively, which were specified in the canceled annex to the resolution of the Moscow Government. However, in accordance with the Decree of the Government of the Russian Federation dated May 6, 2011 No. 354 “On the provision of utility services to owners and users of residential premises,” the consumer is obliged to “established technical documentation to the metering device." In other words, within the time limits specified in the device data sheet. Data sheets for domestic water meters usually indicate calibration intervals in accordance with GOST - 6 years for cold water meters and 4 years for hot water meters, although the calibration interval for some imported meters can be 10-15 years.

2. How does the management company control the timing of verification of apartment water meters?

When installing or replacing water meters, a resident must bring to the management company a certificate of commissioning of the device, which indicates the date of its installation, since only in this case the payment for consumed water will be made based on the readings of the apartment water meter. Thus, the management company has information about the expiration of the verification interval for all water meters installed in the house. And in required period The resident will be informed of the need to perform verification.

3. What consequences can a resident expect if he ignores the verification deadlines?

Without testing, the devices are considered unsuitable for metering water consumption. For subscribers who have not provided verification certificates or replacement of the water meter, payments for housing and communal services based on metering devices will be transferred from apartment to general house metering devices.

4. On what basis did the management company begin to check the registration of residents in apartments without water meters?

On January 30, 2013, the Moscow Department of Housing and Public Utilities and Improvement approved “ Guidelines to identify individuals using residential premises." Based on this document, management companies received the right to identify unregistered residents in order to charge fees for actually consumed water. Under the previous procedure for paying for cold and hot water, only citizens registered in the house were taken into account according to the readings of a common household appliance. . Apartments that are not equipped with water meters will be inspected by the commission at least twice a month. Information about the fact of residence of unregistered citizens will be transferred to the State Property Committee of the district for water charges.

Tatiana SHCHERBAKOVA

Material from Star Boulevard No. 10 (328) from 03/17/2013

If you need it in your home, but don’t know which water meter is best suited for this, we advise you to pay attention to Beregun water meters made in Russia.

Beware of fraudulent water meter companies!

Trust the replacement and verification of water meters to the professionals of the STEK company!

Certificates and licenses

Verification license


Requirements for metrological services legal entities, accredited for the right to verify measuring instruments, and the procedure for their accreditation is established by law. The MS must have a position, structure, quality assurance system, personnel, necessary working standards, premises and conditions that ensure verification of measuring instruments. The regulations on the MS must be approved in accordance with the established procedure.

Order on accreditation of STEC

The activities of "STEC" in verifying water meters are fully consistent building regulations and rules. In particular, SNiP 2.04.01-85. Checking water meters will help reduce utility costs several times. Verification is carried out in any district of Moscow. This is the main argument for the transition from utility standards to strict accounting of water consumption.

Free verification of water meters - Metrological Service STEC

When concluding a service agreement
We take care of all subsequent verification of water meters!



All verifications of your metering devices will be free for you!

Benefits of a service agreement

    By concluding a service agreement, you receive FREE OF CHARGE:
  • All subsequent instrument verifications
  • Free replacement of a faulty water meter
  • Visual inspection in order to identify malfunctions and irregularities in the operation of the water meter
  • Checking the presence and integrity of seals
  • Control reading and recording of water meter readings
  • Checking the operation of the counting mechanism on water meters
  • Cleaning the filter from sediments, sand and scale with disassembly and inspection - if necessary
  • Replacement of gaskets at the joints of water meters - if necessary